|Loading...
share-gyan
  • News
  • Analysis
  • Technical
    ShareGyan Logo

    Powering Nepal's Investors with knowledge

    Quick Links

    • Home
    • Partners
    • Privacy Policy
    • Collaboration Request

    Contact us

    Pulchowk, Lalitpur
    info@peridot.com.np
    9851046764,9801462662

    Follow us

    FacebookInstagramTikTokYouTube
    © 2026 Share Gyan Nepal. All Rights Reserved.
    July 7, 2026

    Golyan Group Moves Ahead with 306 MW Upper Mugu Hydropower Project

    Golyan Group has advanced the licensing process for its 306 MW Upper Mugu Hydropower Project, marking another major step in expanding its renewable energy portfolio in Nepal.

    Golyan Group Moves Ahead with 306 MW Upper Mugu Hydropower Project

    Golyan Group has initiated the generation license process for the 306 MW Upper Mugu Hydropower Project, one of the largest semi-reservoir hydropower projects being developed by Nepal’s private sector. The project, promoted through the group's subsidiary Elevate Energy, will utilize the waters of the Mugu Karnali River flowing through Mugum Karmarong Rural Municipality and Chhayanath Rara Municipality in Mugu district. The company obtained its survey license in 2020 and has since been carrying out detailed technical and feasibility studies. In 2022, the U.S. International Development Finance Corporation (DFC) provided a grant to support the feasibility study, while Germany-based Tractebel Engineering is currently conducting the project's detailed engineering and design. According to Chief Executive Officer Prabin Aryal, geological investigations, including nearly 4 kilometers of drilling and a 400-meter test tunnel, have already been completed, while hydraulic model testing of the headworks is underway at the Hydrolab near Pulchowk Engineering Campus. The project's Environmental Impact Assessment (EIA) has been under review for the past three years. Although the project lies within the buffer zone rather than the core area of a protected national park, policy uncertainties and administrative delays have slowed the approval process. The Department of Electricity Development has now issued a 35-day public notice as part of the generation license process, after which the company is expected to receive final construction approval if no objections are raised. Golyan Group has significantly expanded its investments in renewable energy, with a portfolio exceeding 700 MW across hydropower and solar projects. The company already operates the 36 MW Balefi Hydropower Project, is constructing the 46 MW Upper Balefi Project, and has secured a 170 MW solar quota from the Nepal Electricity Authority, including plans for a 50 MW solar plant in Rolpa.

    Most Recent

    Jul 28, 2026
    Finance Minister Wagle Eyes Asia's Second-Best Stock Market for Nepal

    ShareGyan

    Finance Minister Wagle Eyes Asia's Second-Best Stock Market for Nepal
    Jul 28, 2026
    Finance Minister Wagle to Meet Industrialists on Budget Implementation, Investment

    ShareGyan

    Finance Minister Wagle to Meet Industrialists on Budget Implementation, Investment
    Jul 28, 2026
    Finance Minister Wagle Takes Swipe at PM, Energy Minister Over Adviser Appointments

    ShareGyan

    Finance Minister Wagle Takes Swipe at PM, Energy Minister Over Adviser Appointments
    Jul 28, 2026
    NEA to Adjust VAT Paid on Asar Electricity Bills in Next Billing Cycle

    ShareGyan

    NEA to Adjust VAT Paid on Asar Electricity Bills in Next Billing Cycle
    Jul 28, 2026
    NMB Bank Commits NPR 1.24 Billion Loan to 9 MW Khimti-Ghawang Hydropower Project

    ShareGyan

    NMB Bank Commits NPR 1.24 Billion Loan to 9 MW Khimti-Ghawang Hydropower Project
    Jul 27, 2026
    Nepal Exports 22,102 MWh of Electricity as Domestic Supply Surpasses Demand

    ShareGyan

    Nepal Exports 22,102 MWh of Electricity as Domestic Supply Surpasses Demand